Proper installation of insulated volcanic blocks is essential to ensure best performance. In this guide, we provide practical tips and guidelines for the installation process.
Preparation Before Installation
Material Inspection
Before starting, make sure:
- Block integrity and crack-free condition
- Dimensions match specifications
- Materials are dry and not exposed to moisture
- All necessary tools are available
Installation Steps
- Foundation preparation: Ensure surface is level and clean
- Mortar mixing: Use correct mixing ratios
- Laying first row: Start from corners and use a level
- Leave expansion joints: Approximately every 6 meters
- Continuously check vertical and horizontal alignment
- Fill gaps with mortar completely
Common Mistakes and How to Avoid Them
- Not wetting blocks before installation
- Using old or dry mortar
- Not leaving sufficient expansion joints
- Installing blocks unevenly
- Neglecting corner inspection
Tips for Professionals
To ensure the best result:
- Use mortar specifically designed for volcanic blocks
- Do not install more than 5 rows per day
- Cover work at end of day to protect from rain
- Wait 48 hours before starting finishing
Safety During Work
Follow safety procedures:
- Wear gloves and safety glasses
- Use safe scaffolding
- Secure the work site
- Properly handle heavy blocks
Proper installation is half the quality of the building. Take your time and master the work.
Conclusion
Following these guidelines will ensure proper installation of volcanic blocks and optimal long-term performance.